On a small remodel, the schedule usually lives in your head and your text thread. That works until a sub shows up to a job that isn't ready, or doesn't show up at all, and the client finds out before you do. A short, repeatable set of texts fixes most of it: every sub gets the same details in writing, every date gets a written yes, and every change gets told to the client the same day.
01Why texts work for sub scheduling
Subs are on ladders and in crawlspaces. A text gets read between tasks; a voicemail waits until the end of the day. A text also leaves a record: the address, the date, the arrival window and what was supposed to be ready. When something goes sideways, you scroll up instead of arguing about who said what.
The catch is consistency. If every booking text is written from scratch, details get dropped. Use the same templates every time and the sub learns where to look for the scope, the access info and the "send me a price first" rule.
02The one-page sub schedule
Keep one sheet per job. A notes app, spreadsheet or whiteboard photo all work. The column that matters most is Must be ready first: it's the condition that has to be true before the sub can do their part. Most wasted trips come from a sub arriving before that condition is met.
| Trade | Sub / contact | Scope this visit | Must be ready first | Date | Confirmed | Reminder | Notes |
|---|---|---|---|---|---|---|---|
| Rough plumbing | [sub / phone] | Rough-in for vanity, shower valve, toilet | Demo done, walls open, fixtures on site | [date] | Y · [date] | 48 hr sent | Valve model in garage |
| Rough electrical | [sub / phone] | Boxes, can lights, fan circuit | Plumbing rough done | [date] | — | — | Needs client fan selection |
| Inspection | [city] | Rough plumbing + electrical | Both roughs complete | [date] | Requested | — | Call in by 3 PM day before |
| Drywall | [sub / phone] | Hang, tape, finish bathroom + hall patch | Rough inspection passed | [date] | — | — |
- Scope this visit: what they're doing on this trip, not the whole subcontract. Rough and finish visits are separate rows.
- Confirmed: only mark it when you have a written yes, with the date you got it.
- Reminder: note when the 48-hour reminder went out.
- Notes: materials on site, selections the client still owes, inspection call-in times. Pending selections belong on your selection schedule too.
Review it every Monday as a two-week look-ahead, and update it from your daily log when something slips.
03Eight sub text templates
Fill in the brackets and send. Keep them short; subs read on a phone.
1. Booking request
2. Confirmation (send once they say yes)
The last line in the confirmation is the one that saves money. It sets the rule before anyone is on site: extra work gets priced and approved first.
3. 48-hour reminder
4. Morning-of access text
5. Job not ready: move the date
Send this the moment you know, not the night before. Subs remember who gives them notice.
6. No-show
Stay factual and log it with the date and time. A pattern in the log is more useful than one angry text.
7. Sub finds extra work
Then write it up as a change order and get the client's written approval before the extra work starts. See change order vs. scope creep for how to tell the difference on site.
8. Visit wrapped
04Client heads-up texts
Clients don't need the whole schedule. They need to know who is walking into their house tomorrow, what will be noisy or shut off, and when dates move. Send these the afternoon before or the moment a date changes.
Who's coming tomorrow
A date moved
A sub found something outside the scope
Roll the week's changes into your Friday client update so there's one written summary.
05Three AI prompts
Paste only what you actually know. Read every output before you send it; you're responsible for the dates and the numbers.
Prompt 1: two-week sub schedule + booking texts
Prompt 2: clean up a reschedule text
Prompt 3: sub's extra work → client text + change order line
Prompt 3 is a short version of the change order workflow. A free sample change order prompt is on /packs (no email needed), and the free change order clause and text script is at /free.
AI Project Manager Pack · $47
Schedules, look-aheads and sub texts from a voice note
The AI Project Manager Pack has prompts to draft the job schedule from your durations, run a two-week look-ahead every Monday, confirm subs with ready-to-send texts and handle no-shows. One-time price.
Or start with the free change order prompt, or see every pack on /packs, including the All-Roles Bundle.
06FAQ
Should I schedule subs by text or by phone?
Use whatever gets an answer, but put the final details in a text. A call is fine for working out the date; the text is the record of what was agreed: address, date, arrival window, scope for the visit and what has to be ready.
How far ahead should I confirm a sub?
Many remodelers book the date when the prior phase is scheduled, confirm again about a week out, and send a short reminder 48 hours before. Adjust to your subs. The point is a written yes close to the date, not just a date someone said weeks ago.
What should I do when a sub no-shows?
Text the same morning, stay factual, and ask for a new firm date. Log it with the date and time. If it keeps happening, that log is what you use when you decide who gets the next job.
What if a sub finds extra work on site?
Ask them to stop and send a photo and a price before doing it. Then write it up as a change order for the client to approve in writing before the work happens. Extra work agreed by a nod on site is how small jobs lose money.