Estimating · Templates

Window replacement scope of work: a section-by-section template for contractors

A copy-paste window replacement scope, unit prices for what you can't see until the old window is out, exclusions and assumptions, a sample hidden-conditions note for your attorney, three client texts and two AI prompts that organize the paperwork while you set every number.

BuildFlow AI · November 22, 2026 · About an 8-minute read

A window estimate often fits on one line: "Replace 12 windows, vinyl, white." Then the questions start. Does that include the trim inside? Who takes down the blinds? Is the old frame staying or coming out? What happens when the sill under the old window is soft? A written scope answers those before the client signs, and it's what turns a surprise at removal into a change order instead of free work.

Not legal or code advice. This is general business information. Building codes (including egress, safety glazing and energy rules), lead-safe work rules, flashing requirements, permits, manufacturer warranty terms, insurance rules, HOA rules and contract requirements vary by location. Check with your local building department, and have a local construction attorney review your contract, scope notes and any clause language before you use them.

01Why windows need a written scope

A window hides what's around it. You can't see the sill, the flashing or water damage in the framing until the old unit is out and the opening is exposed.

That's the worst moment to negotiate. If the scope already says which removal method each opening gets, how sill and framing repair is priced, and what happens when something else turns up, the conversation is a text with photos instead of an argument.

Window jobs also touch the inside and outside of the house at the same time: drywall, casing and paint on one side, siding, trim and caulk on the other, and sometimes code questions about egress and safety glass. A scope of work names every part of the job and says whether it's included, excluded, priced by the unit, by others or based on an assumption. When an assumption turns out wrong, you have an agreed reason to write a change order.

02The section-by-section scope template

Copy this into your estimate and fill in the brackets. Delete what doesn't apply. Measurements, products and code details are yours to set per local code and the manufacturer's instructions; the template only gives the sections.

WINDOW REPLACEMENT SCOPE OF WORK Client: [name] · Address: [address] · Year built: [ ] Windows included: [room / location / count, e.g. "Living room front (2), primary bedroom (1)"] Window schedule attached: [Y/N] (size, style, product, options per opening) 1. PROTECTION & ACCESS - Interior: drop cloths, furniture moved by [client / crew], dust barriers at [rooms] - Exterior: protect landscaping, decks and walkways below each opening: [method] - Window coverings (blinds, curtains, rods) removed by [client / crew]; reinstalled [Y/N] - Access: [ladders / staging]; upper-story or special access priced separately 2. REMOVAL - Method per opening: [full-frame to rough opening / insert (pocket) in existing frame] - Remove existing sash, frame and interior/exterior trim as needed for the method listed - Storm windows / screens: [removed and disposed / returned to client] 3. ROUGH OPENING INSPECTION & HIDDEN CONDITIONS - Inspect sill, jambs and header after removal; photos sent to client - Rotted sill or framing repair at $[ ] per [sill / linear foot]; count confirmed in writing - Conditions beyond unit prices = written change order before work continues 4. FLASHING, SILL PAN & WEATHER BARRIER - Sill pan: [type / product] - Flashing tape / flashing at jambs and head: [product], integrated with existing WRB per manufacturer instructions - Existing WRB condition: [repair limited to [ ] around opening / excluded] 5. INSTALLATION - Product: [manufacturer / line / style / color / glass options] per window schedule - Set plumb, level and square; shim at [locations] per manufacturer instructions - Fasteners / anchors per manufacturer instructions; operation checked at each unit 6. INSULATION & AIR SEALING - Gap between frame and opening: [low-expansion foam / backer rod and sealant / other] - Interior air seal: [method] 7. INTERIOR TRIM, CASING & DRYWALL RETURNS - Interior casing: [reuse / new [profile] / excluded] - Stool and apron: [reuse / new / excluded] · Extension jambs: [Y/N] - Drywall returns: [repair limited to [ ] / excluded]; paint and stain: [included / excluded] 8. EXTERIOR TRIM, CAPPING & CAULK - Exterior trim: [reuse / new / aluminum capping (color) / excluded] - Exterior sealant: [product], at [locations] - Siding, brick or stucco repair around openings: [limited to [ ] / excluded] 9. CODE NOTES (check local code) - Egress openings in sleeping rooms: [confirm with local building department] - Safety (tempered) glazing near doors, tubs, showers, stairs or floors: [confirm with local code] - Energy requirements (U-factor etc.): [confirm with local code] 10. LEAD-SAFE PRACTICES (homes built before 1978) - Home built before 1978: [Y/N]; if yes, work performed per EPA RRP rule by [certified firm / renovator] - Pre-renovation information provided to client: [date] - Containment and cleanup per the rule; check EPA and state requirements 11. PERMITS, HAUL-OFF, CLEANUP - Permits pulled by [ ], fees paid by [ ] - Inspections: [as required locally] - Old windows and debris hauled away; daily cleanup; final vacuum and wipe-down at each opening - Manufacturer warranty registration: [who / which program]

A few notes on the sections that cause the most back-and-forth:

  • Window schedule. List every opening by room with size, style and options. "All the windows" means different things to different people.
  • Full-frame vs insert. Say which method each opening gets. Full-frame opens up more of the wall, more trim work and more chances to find damage.
  • Rough openings. You can't see the sill until removal. Put a unit price in the scope so the client agrees to the rate before anyone pulls a window.
  • Inside and outside finish. Casing, drywall returns, paint, exterior trim and capping: say what's included and what isn't.
  • Code and older homes. Egress, safety glass and energy rules vary, so write them as items to confirm with your local building department. For homes built before 1978, note how lead-safe work practices are handled and check EPA and state requirements.
  • Permits. Name who pulls the permit and who pays the fee.

Pricing the job? The remodeling estimate template shows where this scope goes alongside payment terms and an expiration date, and the payment schedule template shows how to tie payments to finished milestones.

03Unit prices for rough opening repairs

You can't see a rotted sill from inside the room. Instead of guessing a number into the price, list a unit price in the scope and bill the actual count with photos. The client agrees to the rate up front, and the count is just documentation.

UNIT PRICES (EXAMPLE ONLY: these numbers are placeholders, not recommended prices) - Sill replacement: $[ ] per sill, installed e.g. "Sill repair: 2 sills x $[ ] = $[ ]" (photos attached) - Jamb or framing repair: $[ ] per linear foot - Exterior trim replacement: $[ ] per opening Counts are confirmed in writing, with photos, before the final invoice.

The numbers above are placeholders to show the format. Use your own pricing. Keep the unit, the photo requirement and the written confirmation. The same idea works for remodeler allowances; see remodeling allowances and overages.

04Exclusions and assumptions

Exclusions say what the price doesn't cover. Assumptions say what the price depends on. On a window job, most of the risk sits in the assumptions about sizes, opening condition, removal method, lead times and weather.

EXCLUSIONS (examples; keep only what fits your job) - Framing, header or structural repair unless listed or priced by unit - Enlarging, reducing or adding openings unless listed - Siding, brick, stucco or masonry repair beyond what's listed - Interior painting, staining or drywall repair beyond the returns listed - Window coverings, blinds and hardware reinstallation unless listed - Electrical work (security sensors, alarm contacts) - by others - Lead or other hazardous material abatement beyond lead-safe work practices listed ASSUMPTIONS (examples) - Existing rough openings are [ ] and square within tolerance; out-of-square openings = change order - Window sizes are confirmed by field measurement before ordering - Removal method is as listed per opening; switching from insert to full-frame = change order - Lead times are set by the manufacturer; openings are not removed until units are on site - Work is weather-dependent; openings are closed or covered at the end of each day - Client approves the window schedule (sizes, styles, colors, glass) by [date]

Read these lists with the client when you review the estimate, and photograph the house before you start: each opening inside and out, the trim, sills, interior walls and floors near each window, and the landscaping below. See jobsite photo documentation for a simple way to file them by job.

05Hidden conditions: a sample scope note

A short note explaining what happens when you find something you couldn't see helps. Here is sample language to take to your attorney. It is not a finished contract clause.

SAMPLE SCOPE NOTE: HIDDEN CONDITIONS (have your attorney review) "The price above is based on the openings as they could be inspected before removal and the assumptions listed. Sill and framing repair is billed at the unit price above, with photos. If we find conditions beyond that, such as rotted headers or studs, water damage inside the wall, openings that are out of square, or materials that need special handling, we will show you what we found and provide a written change order with price and schedule impact before that work starts. We will close or cover the opening while we wait for your written approval."

Attorney note: this is sample language for discussion only. Have a local construction attorney review and adapt it, along with your contract and change order form, before you use it.

When a hidden condition does show up, write the change order before the extra work starts. The change order template covers scope, price, schedule impact and written approval, and how to price extra work walks through pricing it line by line. A free sample change order prompt is on /packs (no email needed), and the free clause and text script is at /free.

06Three copy-paste client texts

Fill in the brackets and send. They work as emails too.

1. After the site visit

Hi [client first name], thanks for walking the house with me today. Before I price the windows I want to confirm: which windows we're replacing, the style and color you're leaning toward, whether you want full-frame or insert replacements, and whether interior trim and paint are part of it. I'll measure again before ordering, and I'll have the scope and estimate to you by [day].

2. The day before install

Hi [client first name], your windows are scheduled for [date], weather permitting. Please take down blinds and curtains and move furniture about [ ] feet back from each window, or let me know and we'll handle it. We'll lay drop cloths and put up dust barriers. Each opening is closed up the same day. If rain is in the forecast, I'll text you the night before.

3. After removal: rot found

Hi [client first name], we pulled the old window in the [room]. The sill underneath is soft and needs to be replaced. Photos attached. Per the scope, that's $[ ] per sill, so $[ ] total. [If something beyond the unit prices:] We also found [condition] that isn't in the price. I'll send a written change order with price and schedule impact, and the opening stays covered until you approve it.

07Two AI prompts

Paste these into ChatGPT, Claude or Gemini with only what you actually know. AI is good at organizing site notes and catching gaps. It should never set your prices, measure the openings or decide code and warranty questions. Read every output before you send it.

Prompt 1: window scope from site notes

Act as an estimator for a small residential window replacement company. Using ONLY my site notes below, write a window replacement scope of work organized in this order: protection and access, removal (full-frame or insert per opening), rough opening inspection and hidden conditions, flashing, sill pan and weather barrier, installation, insulation and air sealing, interior trim and drywall returns, exterior trim, capping and caulk, code notes to check locally, lead-safe practices if the home is older, permits, haul-off and cleanup. For each, write what's included in plain language. Then list likely exclusions and assumptions based only on what I described. Do NOT add prices, sizes, products, code requirements or warranty terms I didn't mention. Mark anything you need from me with [CHECK]. Site notes: [paste or dictate: windows by room, sizes if measured, existing frames, removal method, trim, siding type, year built, client wishes]

Prompt 2: review the scope for gaps

Review this window replacement scope before I price it. Using ONLY the text I paste, list: (1) anything a homeowner might assume is included that isn't stated either way (interior trim, paint, blinds, screens, siding repair, haul-away), (2) hidden-condition items without a unit price (sills, jambs, headers, out-of-square openings), (3) items not assigned to anyone (permits, alarm sensors, window coverings, lead-safe work), (4) code items I should confirm locally (egress, safety glazing, energy). Don't add prices or code requirements. Just list the gaps so I can decide. Scope: [paste]

More estimating prompts are in AI prompts for construction estimators. Doing other exterior work? The siding, roof and deck scope templates follow the same format, and so do the basement, kitchen and bathroom templates.

AI Estimator Pack · $47

Scopes, leveled sub bids and a proposal letter from your site notes

The AI Estimator Pack has copy-paste prompts and workflows for scopes by trade, takeoff checklists, sub bid leveling, pricing extras with your own rates, bid cover letters, estimate review and follow-ups, plus a spreadsheet template. AI organizes the paperwork. You set every number. One-time price.

Or start with the free change order prompt, see every pack on /packs, or get the All-Roles Bundle for $127.

08FAQ

What should a window replacement scope of work include?

Which windows are included (by room and count), the product, size, style and options for each, whether removal is full-frame or insert, how rough opening damage is handled and priced, flashing, sill pan and weather barrier details, installation, insulation and air sealing, interior trim and drywall returns, exterior trim, capping and caulk, notes on egress and safety glass to check with local code, lead-safe practices for older homes, permits, haul-off and cleanup, plus exclusions and the assumptions your price depends on.

What's the difference between a full-frame and an insert window replacement in the scope?

An insert (pocket) replacement leaves the existing frame in place and sets a new unit inside it. A full-frame replacement removes the old window down to the rough opening, which opens up the flashing, weather barrier and framing. They affect price, trim work and how much hidden damage you might find, so the scope should say which one each opening gets.

How should I price rot I find in the rough opening?

Many window contractors list a unit price in the scope, such as per sill or per linear foot of framing repair, so the client agrees to the rate before removal. Then photograph what you find and confirm the work in writing before you do it. Set your own rates, and check your local and state requirements.

Write down what's in, what's out, and what a rotted sill costs. Then pull the window.

Start with the free change order prompt, download the clause and text script at /free, see every role pack at /packs/, or get the full workflow.

Free: change order prompt

Paste it into ChatGPT, Claude or Gemini with your job note and get a short change order draft. No email needed. The free clause and text script is here.

Get the free prompt

The AI Estimator Pack

Scopes, takeoff checklists, sub bid leveling, pricing extras, cover letters and estimate review. $47, one time.

Estimator Pack · $47

The AI Change Order Pack

Prompts, the editable template, approval texts and the manual and automated setups. $47, one time.