Flooring installation scope of work: a section-by-section template for contractors
A copy-paste flooring scope, unit prices for the subfloor problems you find after tear-out, exclusions and assumptions, a sample note for your attorney, three client texts and two AI prompts. You set every number.
BuildFlow AI · November 25, 2026 · About an 8-minute read
A flooring estimate often fits on one line: "Install 560 sq ft LVP, kitchen, hall and living room." Then the questions start. Who moves the couch? Who unhooks the fridge? Is the baseboard coming off, and who paints it? What happens when the old vinyl comes up and the subfloor by the dishwasher is soft? A written scope answers those before the client signs, and turns a surprise after tear-out into a change order instead of free work.
Not legal or code advice. This is general business information. Building codes, manufacturer installation and warranty requirements, lead and asbestos rules for older homes, and contract requirements vary by product and location. Follow the manufacturer's instructions, check local code and EPA and state requirements, and have a local construction attorney review your contract, scope notes and any clause language before you use them.
01Why flooring needs a written scope
Old flooring hides what's under it. You can't see the subfloor, the leveling it needs, a second layer of vinyl or an old leak until the existing floor is up.
That's the worst moment to negotiate, because the room is torn apart and the client wants it back. If the scope already says how subfloor repair and leveling are priced, what happens with moisture readings, and who handles furniture and appliances, the conversation is a text with photos instead of an argument.
Flooring also touches everything around it: baseboard, doors, transitions to the next room, stairs and the appliances sitting on top. A scope of work names each part and says whether it's included, excluded, priced by the unit, by others or based on an assumption. When an assumption turns out wrong, you have an agreed reason to write a change order.
02The section-by-section scope template
Copy this into your estimate and fill in the brackets. Delete what doesn't apply. Products, quantities, moisture limits and installation methods are yours to set from the manufacturer's instructions and your own measurements; the template only gives the sections.
FLOORING INSTALLATION SCOPE OF WORK
Client: [name] · Address: [address] · Year built: [ ]
Areas included: [room / area / measured sq ft, e.g. "Kitchen 180, hall 60, living room 320"]
Product schedule attached: [Y/N] (product, color, size, pattern, waste factor per area)
1. PROTECTION & PREP
- Furniture moved by [client / crew]; items excluded: [pianos, safes, electronics, contents of cabinets]
- Appliances disconnected / reconnected by [client / crew / licensed trade]
- Dust protection at [doorways / HVAC returns]; protection of adjacent floors: [method]
2. REMOVAL OF EXISTING FLOORING
- Remove [carpet & pad / vinyl / tile / laminate / hardwood] at [areas]; layers expected: [ ]
- Tack strip, staples and adhesive residue: [removed / scraped / ground] to [standard]
- Haul-off and disposal: [included / by client]
3. SUBFLOOR INSPECTION, REPAIR & LEVELING
- Inspect subfloor after removal; photos sent to client
- Flatness to the manufacturer's tolerance for the product; leveling compound / sanding at the unit prices below
- Damaged or soft subfloor replacement at the unit prices below; squeak fastening: [included / per area]
- Conditions beyond unit prices (joist or structural damage, water damage) = written change order
4. MOISTURE & ACCLIMATION
- Moisture testing of [concrete slab / wood subfloor] per manufacturer instructions; results shared with client
- Vapor barrier / moisture mitigation: [included / priced separately if readings require it]
- Acclimation of materials per manufacturer instructions: [on site [ ] days / not required for product]
5. UNDERLAYMENT
- Underlayment: [product / attached pad / cement board / uncoupling membrane] at [areas]
6. INSTALLATION
- Method: [floating / glue-down / nail-down / thinset] per manufacturer instructions
- Layout and direction: [ ]; pattern: [ ]; starting point approved by client: [Y/N]
- Expansion gaps per manufacturer instructions; grout / sealer (tile): [color / product]
7. TRANSITIONS, THRESHOLDS & STAIRS
- Transitions at [locations]: [type / color]
- Height differences at [locations]: [reducer / ramp / noted as assumption]
- Stairs: [count] treads and risers, nosing: [type] / excluded
8. BASEBOARD, TRIM & DOORS
- Baseboard: [reuse / new [profile] / excluded]; quarter round or shoe: [Y/N]
- Paint, caulk and nail-hole fill on trim: [included / excluded]
- Door undercutting: [count]; door rehang or trimming beyond undercut: [excluded / per door]
9. OLDER HOMES & SPECIAL MATERIALS (check local, EPA and state requirements)
- Home built before 1978 and work disturbs painted surfaces (e.g. baseboard): [Y/N]; if yes, lead-safe practices per EPA RRP by [certified firm / renovator]
- Existing resilient flooring, adhesive or mastic suspected of containing asbestos: [testing by [ ] before removal / excluded]
10. CLEANUP & CLOSEOUT
- Daily cleanup; final vacuum / dust mop; furniture returned by [client / crew]
- Leftover material: [left with client / returned]; care instructions and product info provided
- Manufacturer warranty registration: [who / which program]
A few notes on the sections that cause the most back-and-forth:
Areas and measurements. List every room with measured square footage and the product for each. "The main floor" means different things to different people.
Furniture and appliances. Say who moves what and who disconnects appliances with water or gas lines. Use a licensed trade where required.
Subfloor and leveling. You can't see it until removal. Put unit prices in the scope so the client agrees to the rate before tear-out.
Moisture and acclimation. Follow the manufacturer's instructions for testing and acclimation, and say what happens if readings are outside the product's limits.
Older homes. Old resilient flooring and adhesives, and painted trim in homes built before 1978, can need special handling. Write how testing and lead-safe practices are handled, and check EPA and state requirements.
Pricing the job? The remodeling estimate template shows where this scope goes alongside payment terms and an expiration date.
03Unit prices for subfloor repairs
You can't see the subfloor until the old floor is up. List unit prices for the repairs you commonly find, then bill the actual count with photos.
UNIT PRICES (EXAMPLE ONLY: these numbers are placeholders, not recommended prices)
- Subfloor sheet replacement: $[ ] per sheet, installed
e.g. "Subfloor: 2 sheets x $[ ] = $[ ]" (photos attached)
- Floor leveling / patching: $[ ] per [bag / sq ft]
- Removal of additional flooring layer: $[ ] per sq ft
- Additional stair treads: $[ ] per tread
Counts are confirmed in writing, with photos, before the final invoice.
The numbers above are placeholders to show the format. Use your own pricing. Keep the unit, the photo requirement and the written confirmation. If the client hasn't picked a product yet, see remodeling allowances and overages for how to write a flooring allowance.
04Exclusions and assumptions
Exclusions say what the price doesn't cover. Assumptions say what it depends on: on a flooring job, mostly the measurements, the number of existing layers, the subfloor, moisture and who clears the rooms.
EXCLUSIONS (examples; keep only what fits your job)
- Joist, beam or structural repair
- Subfloor repair or leveling beyond the unit prices listed
- Moisture mitigation beyond what's listed if readings exceed the product's limits
- Testing or abatement of asbestos, lead or other hazardous materials beyond what's listed
- Moving pianos, safes, aquariums, electronics or cabinet contents
- Plumbing or gas disconnect / reconnect unless listed (licensed trade)
- Wall painting, drywall repair and cabinet modifications
- Trimming or rehanging doors beyond undercutting
ASSUMPTIONS (examples)
- Square footage is from field measurement on [date]; changes to areas = change order
- Existing flooring is [ ] layer(s); additional layers = change order
- Subfloor is sound and within the manufacturer's flatness tolerance except where repaired at unit prices
- Moisture readings fall within the product's limits
- Rooms are cleared and appliances disconnected before the crew arrives (unless listed above)
- Client approves product, color and layout by [date]; lead times are set by the supplier
Read these lists with the client when you review the estimate, and photograph each room before you start: the existing floor, baseboard, doors, adjacent floors and anything already damaged. See jobsite photo documentation for a simple way to file them by job.
05Hidden conditions: a sample scope note
A short note explaining what happens when you find something you couldn't see helps. Here is sample language to take to your attorney. It is not a finished contract clause.
SAMPLE SCOPE NOTE: HIDDEN CONDITIONS UNDER THE OLD FLOOR (have your attorney review)
"The price above is based on the floors as they could be inspected before removal and the assumptions listed. Subfloor repair and leveling are billed at the unit prices above, with photos and a count. If we find conditions beyond that, such as damaged joists, water damage, extra layers of flooring, moisture readings outside the product's limits, or materials that may need special handling, we will stop that part of the work, show you what we found and provide a written change order with price and schedule impact before that work starts."
Attorney note: this is sample language for discussion only. Have a local construction attorney review and adapt it, along with your contract and change order form, before you use it.
When a hidden condition does show up, write the change order before the extra work starts. The change order template covers scope, price, schedule impact and written approval, and how to price extra work walks through pricing it line by line. A free sample change order prompt is on /packs (no email needed), and the free clause and text script is at /free.
06Three copy-paste client texts
Fill in the brackets and send. They work as emails too.
1. After the site visit
Hi [client first name], thanks for walking the house with me today. Before I price the floors I want to confirm: which rooms are included, the product and color you're leaning toward, who's moving furniture and appliances, and whether baseboard and trim paint are part of it. I'll confirm measurements before ordering, and I'll have the scope and estimate to you by [day].
2. The day before install
Hi [client first name], your flooring install starts [date]. Please clear [rooms] of furniture, rugs and anything on the floor by [time], or let me know which items you'd like us to move per the scope. [Appliances] need to be disconnected by [who]. Expect some noise and dust during tear-out; we'll protect doorways and vents.
3. After tear-out: subfloor damage found
Hi [client first name], we pulled up the old floor in the [room]. [What you found, e.g. "Two sheets of subfloor near the dishwasher are soft from an old leak."] Photos attached. Per the scope, that's $[ ] per sheet, so $[ ] total. [If beyond the unit prices:] We also found [condition] that isn't in the price. I'll send a written change order with price and schedule impact before we do that work.
07Two AI prompts
Paste these into ChatGPT, Claude or Gemini with only what you actually know. AI is good at organizing site notes and catching gaps. It should never set your prices, measure the job or decide code and warranty questions. Read every output before you send it.
Prompt 1: flooring scope from site notes
Act as an estimator for a small residential flooring contractor. Using ONLY my site notes below, write a flooring installation scope of work in this order: protection and prep (furniture and appliances), removal of existing flooring, subfloor inspection, repair and leveling, moisture and acclimation, underlayment, installation, transitions, thresholds and stairs, baseboard, trim and doors, notes for older homes and special materials, cleanup and closeout. For each, write what's included in plain language and who is responsible. Then list likely exclusions and assumptions based only on what I described. Do NOT add prices, square footage, products, moisture limits, code requirements or warranty terms I didn't mention. Mark anything you need from me with [CHECK].
Site notes:
[paste or dictate: rooms and measured sq ft, existing flooring and layers, subfloor type, product, stairs, trim, appliances, year built, client wishes]
Prompt 2: review the scope for gaps
Review this flooring scope before I price it. Using ONLY the text I paste, list: (1) anything a homeowner might assume is included that isn't stated either way (furniture moving, appliances, baseboard, paint, door trimming, haul-away), (2) hidden-condition items without a unit price (subfloor, leveling, extra layers, moisture), (3) items not assigned to anyone (appliance hookups, testing for older materials, leftover material), (4) items I should confirm with the manufacturer's instructions or local requirements. Don't add prices or code requirements. Just list the gaps so I can decide.
Scope:
[paste]
Scopes, leveled sub bids and a proposal letter from your site notes
The AI Estimator Pack has copy-paste prompts and workflows for scopes by trade, takeoff checklists, sub bid leveling, pricing extras with your own rates, bid cover letters, estimate review and follow-ups, plus a spreadsheet template. AI organizes the paperwork. You set every number. One-time price.
What should a flooring installation scope of work include?
Which rooms and areas are included and the measured square footage, the product for each area, furniture and appliance moving, removal and disposal of existing flooring, subfloor inspection, repair and leveling and how they are priced, moisture testing and acclimation per the manufacturer, underlayment, the installation method and layout, transitions, thresholds and stair details, baseboard and trim, door undercutting, notes on older homes and materials that need special handling, cleanup and haul-off, plus exclusions and the assumptions your price depends on.
How should I price subfloor problems I find after tear-out?
Many flooring contractors list unit prices in the scope, such as per sheet of subfloor replaced or per bag or square foot of leveling compound, so the client agrees to the rate before the old floor comes up. Then photograph what you find and confirm the count in writing before you do the work. Set your own rates.
Should the scope say who moves furniture and appliances?
Yes. Say who moves furniture, who disconnects and reconnects appliances such as refrigerators with water lines, ranges and dishwashers, and whether gas or plumbing connections are handled by a licensed trade. It is one of the most common day-one surprises on flooring jobs.
Write down who moves the fridge, what a soft sheet of subfloor costs, and what happens with a second layer. Then pull up the floor.
Start with the free change order prompt, download the clause and text script at /free, see every role pack at /packs/, or get the full workflow.
Free: change order prompt
Paste it into ChatGPT, Claude or Gemini with your job note and get a short change order draft. No email needed. The free clause and text script is here.